From zoning to title deed: what you need to know
Key information on spatial planning, the building process and urban regeneration in Turkey, plus a collection of official lookup services.
Plan hierarchy
What can be built on a parcel is determined by a hierarchy of plans, from the largest scale down to the smallest. A lower-scale plan may not contradict a higher-scale one.
| Plan | Scale | What it determines |
|---|---|---|
| Spatial Strategy Plan | 1/250.000 – 1/500.000 | Development strategy at regional and national scale |
| Environmental Plan | 1/25.000 – 1/100.000 | Land-use decisions: urban, agricultural, forest and protected areas |
| Master Zoning Plan | 1/5.000 (1/2.000) | Density, main transport, public facilities and land-use zones |
| Implementation Zoning Plan | 1/1.000 | Parcel-level development: FAR, site coverage, setbacks, height |
| Parcellation | Cadastral sheet | Applying the plan on the ground as blocks and parcels |
Zoning and building terms
From land to occupancy permit
İmar durumu — zoning certificate
The plan decisions are obtained from the municipality; feasibility is assessed accordingly.
Project
Architectural, structural, mechanical and electrical designs are prepared together.
Permit and inspection
The building permit is obtained; the building inspection firm supervises the process.
Occupancy permit and title deed
The occupancy permit is obtained; the construction servitude is converted to condominium title.
As of 2026
Law No. 7471 lowered the decision quorum for at-risk buildings from two-thirds to a simple majority of shares . With the 4 February 2026 amendment to the regulation, a single owner can call a meeting; the notice period is 15 days.
Shares of owners who do not agree are sold by auction, not below market value, first to the other shareholders 15 days after notification; if there is no sale, the Urban Regeneration Directorate, the administration or TOKİ may buy the share.
Istanbul’s “Yarısı Bizden” (Half from Us) campaign provides a TRY 875,000 grant, a TRY 875,000 loan and TRY 125,000 relocation support per home; the application deadline is 31 December 2027. For details, see the Construction page.
Checklist
- 01Mortgages, liens, annotations and declarations on the title record (including any at-risk building declaration)
- 02Zoning status and planned use (residential, commercial, agricultural, protected area)
- 03Building permit, occupancy permit and compliance with the design
- 04Construction servitude or condominium title
- 05Earthquake hazard, ground conditions and year of construction (before/after the 2018 earthquake code)
- 06Compulsory earthquake insurance (DASK), management plan and service-charge status
- 07Special restrictions such as the coastline boundary, heritage sites or agricultural land
- 08That the listing is verified via EİDS and that the agent holds a licence
Lookups and applications
The links below open the public institutions’ own websites (mostly in Turkish).
This page is for information only, is current as of October 2026 and does not constitute legal advice. Legislation may change; confirm with the relevant institution and the Official Gazette before any transaction.