MAYYER
Home / ConstructionConstruction

From design to turnkey

We manage the entire process of your investment buildings, from design to turnkey delivery, in line with current zoning and building regulations.

General contracting

Design, permit coordination, construction and handover from a single source. At the building-permit stage, the contractor’s Ministry-registered licence and class are the basis.

  • Turnkey construction
  • Cost and schedule management
  • Coordination with the building inspection firm
  • Mechanical infrastructure by our own team

Urban regeneration

Renewal of at-risk buildings under Law No. 6306; process management from risk assessment to occupancy permit.

  • Application for risk assessment
  • Simple-majority decision and owner agreement
  • Design, permit and demolition
  • Guidance on state-support applications

Land-for-flats construction

A transparent, secured contract model based on sharing units with the landowner.

  • Zoning and FAR analysis, feasibility
  • Notarised contract
  • Delivery schedule and guarantee structure
  • Transition from construction servitude to condominium title
Urban regeneration · 2026

Current process

Under Law No. 7471 (Official Gazette, 9 November 2023) and the 4 February 2026 amendment to the implementing regulation, decisions are now taken by a simple majority of shares.

  1. Risk assessment

    A Ministry-licensed firm carries out the assessment. The result is annotated on the title deed and owners are notified via e-Devlet.

  2. Meeting and decision

    A meeting can be called at the request of a single owner. Decisions are taken by a simple majority of shares (more than 50%).

  3. Notification and sale of shares

    Owners who do not agree are given 15 days. Shares not accepted are sold by auction, not below market value, first to the other shareholders.

  4. Design, permit, construction

    After demolition the at-risk annotation is removed; construction is completed with design, permit and inspection, and the occupancy permit is obtained.

TRY 875,000Grant per home
TRY 875,000Loan per home
TRY 125,000Relocation support
31.12.2027Application deadline

The “Yarısı Bizden” (Half from Us) campaign applies to building-based regeneration in Istanbul. For commercial units, the grant and loan are TRY 437,500 each. Amounts and conditions may change; confirm with the Urban Regeneration Directorate before applying.

Legislation

The framework we work in


RegulationSubject
Zoning Law No. 3194Zoning plan, building permit, occupancy permit (iskân)
Zoning Regulation for Planned AreasFAR, site coverage (TAKS), setbacks, building height
Law No. 6306 and its Implementing RegulationAt-risk buildings, urban regeneration, simple-majority decision
Building Inspection Law No. 4708Design and construction inspection
Turkish Building Earthquake Code (2018)Earthquake-resistant design, in force since 1 January 2019
Regulation on the Classification of Building ContractorsContractor licence, class and work experience
Condominium Law No. 634Construction servitude, condominium title, management plan
Brands we use in our projects
SchücoSaint-GobainKnaufSikaHiltiRehauJotunİzocamKaleKalekimWeber

Brands and registered logos belong to their owners; MAYYER is not a representative of these brands.

Quotation

Let’s assess your land or building together

We start with the block/parcel details and the title record. We determine the zoning status, FAR and feasible building programme, and present the land-for-flats or turnkey options to you in figures.